Back to home

Case Study

Blue-green CI/CD deployments for low-risk production releases

Designed and implemented blue-green deployment workflows to enable safe, predictable production releases. The goal was to reduce deployment risk, allow fast rollback, and improve release confidence without slowing teams down.

AWS CI/CD Blue-Green ECS ALB
Blue-green deployment flow with CI/CD pipeline and load balancer

1) Problem

  • Application deployments were manual and error-prone.
  • Services were containerized with Docker but ran without orchestration.
  • Deployments caused noticeable downtime and rollback was manual.

2) Architecture

  • Migrated workloads to Amazon ECS for managed container orchestration.
  • Introduced blue-green deployments using load balancer target groups.
  • Automated build and deployment flow to eliminate manual release steps.
  • Enabled controlled traffic switching and fast rollback between versions.
Architecture diagram showing blue and green services behind a load balancer

3) Outcome

  • Eliminated deployment-related downtime during releases.
  • Reduced deployment risk with predictable rollouts and instant rollback.
  • Improved release confidence and reduced operational overhead.
Note: Implementation details generalized for confidentiality.