Case Study
Blue-green CI/CD deployments for low-risk production releases
Designed and implemented blue-green deployment workflows to enable safe, predictable production releases. The goal was to reduce deployment risk, allow fast rollback, and improve release confidence without slowing teams down.
AWS
CI/CD
Blue-Green
ECS
ALB
1) Problem
- Application deployments were manual and error-prone.
- Services were containerized with Docker but ran without orchestration.
- Deployments caused noticeable downtime and rollback was manual.
2) Architecture
- Migrated workloads to Amazon ECS for managed container orchestration.
- Introduced blue-green deployments using load balancer target groups.
- Automated build and deployment flow to eliminate manual release steps.
- Enabled controlled traffic switching and fast rollback between versions.
3) Outcome
- Eliminated deployment-related downtime during releases.
- Reduced deployment risk with predictable rollouts and instant rollback.
- Improved release confidence and reduced operational overhead.
Note: Implementation details generalized for confidentiality.